Jervis and Agamemnon Crossing Hydro Construction Project 3

On-Site Medical Support at the Jervis Inlet and Agamemnon Crossing Project

BC Hydro is upgrading the high-voltage transmission lines that cross Jervis Inlet and the Agamemnon crossings near Powell River, on British Columbia’s Sunshine Coast. Much of the work takes place on remote islands and shorelines reached by marine barge, so medical support has to be staged on site, not dispatched from town.

Western Pacific EMS was awarded the remote medical support contract for the project. We are supplying Mobile Treatment Centres, an industrial ambulance and paramedic staff along the right-of-way, plus medical standby at BC Hydro’s Malaspina Substation.

Project at a glance

ClientBC Hydro
ProjectJervis Inlet and Agamemnon Crossing transmission upgrade
LocationNear Powell River, Sunshine Coast, BC
Site accessMarine barge and water taxi
Equipment4 Mobile Treatment Centre (MTC) units, a 4×4 industrial ambulance, a Paramedic Response Unit and Emergency Transport Vehicle (ETV)
PersonnelParamedics and Advanced First Aid attendants
Additional siteMalaspina Substation

Project overview

The project replaces and modernizes the transmission infrastructure that carries power over Jervis Inlet and the Agamemnon crossings. The major work includes:

  • Installing new footings and foundations for transmission towers along the right-of-way
  • Installing anchor points
  • Replacing the high-voltage transmission lines that span the crossings

Equipment and personnel deployed

Western Pacific EMS has staged four Mobile Treatment Centre (MTC) units and a 4×4 industrial ambulance at key points along the project right-of-way. This includes remote islands where transmission towers and lines are being replaced.

Paramedics and Advanced First Aid attendants staff the MTC units and industrial ambulance at each location, so crews working on towers, foundations and line replacement have medical care close to the work.

Marine access and remote-site logistics

The work sites are accessed by marine barge. Our paramedics and emergency response personnel reach their MTC units by water taxi.

The Sunshine Coast has no road link to Vancouver, where the nearest major trauma centre is located. That distance is why this project calls for experienced medical personnel who are equipped and prepared to work in remote locations.

Medical standby at Malaspina Substation

Alongside the transmission line work, Western Pacific EMS is providing a Paramedic Response Unit and Emergency Transport Vehicle (ETV) at BC Hydro’s Malaspina Substation while the system undergoes upgrades and repairs.

Training for energized BC Hydro sites

Working on BC Hydro sites takes more than standard medical certification. Western Pacific EMS Paramedics and Advanced First Aid attendants assigned to BC Hydro projects complete additional training, including the power system safety courses required to safely access secure, energized sites.

This project builds on our medical support for BC Hydro sites, including the 1L130 transmission upgrade.

About Western Pacific EMS

Since 2006, Western Pacific EMS has provided emergency medical services, first aid, MTC rentals, and ETV rentals to energy, utility and transmission companies across Western Canada. We provide standby medical support to power line construction companies, public utilities, engineering firms and the energy sector, including generating stations, facility upgrades and plant turnaround projects.

Clients and projects we have supported include BC Hydro, the Site C project, Pacific Electrical Contractors (AECON), Valard, Voith Hydro, Allteck, Houle Electric and PCL West Coast Constructors.

Planning a remote utility or transmission project?

Western Pacific EMS provides MTC rentals, industrial ambulances and on-site paramedic support for utility and transmission projects across Western Canada. Contact us or email info@pacific-ems.com to discuss your project.